Following an issue located during testing today there will be some work carried out to resolve a water leak on our generator.
An inspection will take place approx 8:30am Friday and once the leak has been localised a plan of action will be made to resolve the issue.
This work will not affect power to the data centre however there may be short periods where the generator in unable to take the load.