We have been infirmed that Virgin media are working on one of the 10G Links to our Huntingdon Data Centre
Planned Work Start (Local UK): 01/09/2022 00:01
Planned Work End (Local UK): 01/09/2022 06:01Impact: There will be a loss of service at some point during the timeframe stated above whilst we complete the maintenance work.
The service outage should only last for up to 4 hours; however a 6 hour timeframe has been given in the event of any unforeseen circumstances.
This Emergency planned work is required to replace a hard spliced fibre patch at our site in Northampton that is causing degraded services
Corresponding Fault ticket reference = F010066288.
We do have resilient routes to the data centre however the data centre should be deemed to be at risk during these works