During a routine test we have discovered a small issue on our generator that, whilst not immediately service impacting, needs attention. Our specialist engineers have assessed the generator and determined that replacement parts are required.
These will be installed on Tuesday 18th August. During the work window (approx. 2 hours) the generator will be shut-down and unable to take the load if there is any mains power issue. We still have our main backup UPS on line as well as smaller ones protecting core network & client areas.
We don’t envisage any downtime or other network/client affecting issues because of this work and this is an advisory only.