INFO: supplier equipment upgrades overnight 15/16th June

The works detailed below should have no effect on services delivered via the Merula network apart from a possible brief period of routing instability as they re-converge after the link comes back on-line

Service Affected:
Level3 Transit Bearer Manchester

Start of maintenance:
15/06/2017 22:00 BST

End of maintenance:
16/06/2017 03:00 BST

Duration of work:
up to 45 minutes within the outage window

Impact of work:
Outage to listed service

Classification of works:
Standard

Description of works:
Third Party maintenance on underlying fibre connections

1 minutes silence at 11am today, 6th June

Merula will be respecting a minutes silence at 11am today in memory of those who died and were injured in the London attack on Saturday evening.

Please be aware that if you are in contact with one of our agents at this time you may be asked to wait until the minutes silence has been observed.

OUTAGE: leased lines down [resolved]

We apologise but are aware of a number of leased lines that have dropped because of a hardware fault on a core switch in London.

We will have this restarted within the hour and will be replacing this switch with a new one overnight. More status updates will be posted here.

[update] The initial issue was resolved before 6pm and the replacement hardware was installed in London this evening. This is being monitored but we hope this will resolve the issue once and for all

Emergency Planned Work Affecting some DSL Connections 16/05/2017

One of our carriers (TalkTalk) is performing some emergency planned works on their interconnect in Telehouse North. We have resilient Interconnects in other locations however during the work you may see your connections drop and re-connect over our alternative Interconnect

The work is scheduled for between 16/05/2017 20:00 and 17/05/2017 06:00

If there are any issues please contact support via the normal routes

INFO: logging & reporting issues 4/4/17

We are seeing a few ADSL/FTTC lines that we are unable to monitor internally to track performance and transfer speeds. To overcome this we may need to reboot an internal switch that will mean that the PPP sessions on these few lines will momentarily drop. The circuits should all come back on-line automatically, but if you find an issue please re-boot your router to establish the session.

INFO: mail-server upgrade 4th April 2017

One of our clustered mail-server machines will be updated and moved to a new location at some point tonight. This will not involve any down-time but mail delivery may be slightly slower than usual for a period of up to 2 hours as the databases sync back.