Core router swap-out Due: 13th March 2015 Time: 10pm onwards

We are upgrading & replacing one of our resilient core Cisco routers in Telehouse late on Friday night.

Whilst we do not expect any down-time on any of our circuits related to this work, you should be aware that there may be temporary routing issues for a period up to an hour, whilst this is being completed.

UPDATE: delayed At Risk – Generator Test / Service 21/01/2015

This test has now been delayed until 21st.

During the day of 12th January 2015 we are having a full service on our generator including a load bank test which will stress test our generator and ‘prove’ it is fully working and able to take the load from our data centre. This will not affect the ‘normal’ usage in our data centre.

However at times during the work this will mean the generator is not able to take the load IF a power issue occurs. We do still have our on site generator and we are not anticipating any issues – however as there is a small risk we are publishing this in advance.

We will update this post once the work is complete

UPDATE: [completed] Battery Replacement – HEX UPS 6/01/15

UPDATE: this work has been successfully completed.

Our UPS at Harbour Exchange Square (HEX) in London is showing a battery fault and we have replacements on the way.

NOTE this UPS is in addition to the Data Centres own UPS and generator.

Subject to the arrival of the new batteries we are planning to replace the battery pack in the evening on Tuesday 6th January. This should not cause an outage as tney are designed to be swapped while the unit remains on.

However with all work on this kind there is a small risk.

We will update this post as the work progresses. Any questions please contact support in the normal way.

Advisory only: ADSL connections [resolved]

Currently BT are investigating a fault on one of the resilient pair back-haul lines used for ADSL bandwidth. This isn’t (and won’t) affecting customer lines in anyway. However, any change to this situation that may then affect connections will be posted here and we will also post here to advise when this line is fixed.

BT have been working on the faulty link overnight and this now appears to be working. We are awaiting the final ‘all clear’ but the issue seems to be resolved

UPS Maintenance 28/10/2014 [completed]

Third Party Maintenance engineers will be performing a scheduled maintenance / test of our UPS System in Huntingdon Tuesday afternoon from 5pm onwards.

This should cause no issues at all (and they have investigated fully the issues last time – including performing these works out of hours.

As with all activities there is a small risk, however we will remain on site while this works proceed and will update this post as the work progresses

This work was completed without incident